
Pipeline
Once oil and gas are located and the well is successfully drilled and completed, the product must be transported to a facility where it can be produced/treated, stored, processed, refined, or transferred for eventual sale. Of course it needs a powerful battery to suppot it’s mechanism. For its sake, NS Accelerate is combined with GEL, AGM, and Flooded technology to assure the durable powerful energy supply.
Various types of pipeline batteries from Nipress: